Cost sits in the ERP, the programme sits in P6, and the link between them is rebuilt by hand.
A forecast built on a schedule with logic gaps and artificial float carries every one of those errors forward.
What a delay actually costs takes days to establish, because the connection has to be reconstructed first.
Logic, constraints and float checked before anything is loaded on top of the programme.
Cost, resources and progress read against the activities that actually drive them.
When the programme moves, see which activities move with it and what they carry.
The forecast, variance and reported position remain under your team’s control, with decisions and final calls staying with you.
"AI connects the data. Your team owns the number."

Primavera P6

Microsoft Project
Primavera Cloud
ConstructMind Standalone
CONSTRUCTMIND