COST ENGINEERS

Your cost forecast inherits the schedule’s errors.

Connect programme activities to cost, resources and progress — and know the schedule underneath your forecast has been checked before you build on it.
OUR FOUNDATION

Cost moves when the programme moves. The forecast doesn’t.

Time-phased cost is derived from the schedule, then maintained separately from it. Every programme revision leaves the forecast describing a plan that no longer exists.
01

Separate Systems

Cost sits in the ERP, the programme sits in P6, and the link between them is rebuilt by hand.

02

Inherited Errors

A forecast built on a schedule with logic gaps and artificial float carries every one of those errors forward.

03

Slow Answers

What a delay actually costs takes days to establish, because the connection has to be reconstructed first.

HOW CONSTRUCTMIND HELPS

From a checked programme to a position you trust.

ConstructMind AI validates the schedule your cost position depends on, and connects it to the activities carrying the money. Your cost team owns the numbers.
01

Validate the Schedule

Logic, constraints and float checked before anything is loaded on top of the programme.

02

Connect Cost to Activities

Cost, resources and progress read against the activities that actually drive them.

03

See Movement Early

When the programme moves, see which activities move with it and what they carry.

04

Your Team Owns the Number

The forecast, variance and reported position remain under your team’s control, with decisions and final calls staying with you.

"AI connects the data. Your team owns the number."

BUILT FOR COST ENGINEERS

The schedule foundation your cost position sits on.

Validated logic, activity-level cost connection, resource visibility and progress against plan — so the position is built on a programme that has been checked.

Validated Schedule Foundation

Consistent schedule quality checks applied before the programme carries any cost, ensuring the baseline is reliable and ready for downstream use.

Activity-Level Cost Connection

Cost positions tied directly to the activities that drive them, rather than being managed through a separate cost breakdown.

Resource-Loaded Schedule Visibility

Resource demand read against the programme, showing where resources are required and how they align with planned activities.

Progress Against Plan

Reported progress compared with the plan at activity level, providing a clear basis for valuation, forecasting and variance.
EASY INTEGRATION

Between the programme and financial systems.

ConstructMind AI reads the programme from Primavera P6, Microsoft Project or Primavera Cloud and connects it to the ERP and project systems your cost data already lives in.

Primavera P6

Microsoft Project

Primavera Cloud

ConstructMind Standalone

Seamless Workflow Loop

Programme in P6 or MSP

ConstructMind AI

Activities connected to cost and resources

Your ERP and reporting

TWO WAYS TO WORK WITH CONSTRUCTMIND

Control cost on one project. Or report it across the business.

Start by connecting cost to the programme on a single project, or standardise how every project reports cost and progress against plan.

CONSTRUCTMIND

Cost connected to the programme on one project.

For cost engineers who need the schedule under their position checked and connected on one project.
ConstructMind Pro

FOR ENTERPRISE TEAMS

Consistent cost and progress reporting.

For cost functions consolidating position and variance across a portfolio on a consistent basis.

Bring a real programme. Not a sample project.

Discover how AI-powered project intelligence can help your team plan validate and manage complex construction programmes with greater confidence.