01 — GENERATE 

AI Schedule Generation

Turn drawings, bills of quantities, specifications and method statements into a structured, traceable programme, with every activity linked back to its source document for greater clarity, confidence and control.
How it Works

Four stages. One structured programme.

A baseline is usually assembled by hand, under time pressure, from documents nobody has the hours to read twice. ConstructMind AI reads them all and builds the first draft. 
01

Upload Project Documents

Drawings, BOQs, specifications, scope and method statements, read as one connected set.

02

Extract the Scope

Quantities that inform proposed durations and the resource assumptions behind them. 

03

Specifications 

Propose activities, durations and logic links from the scope and construction method, not generic templates.

04

Review and Take It Forward

Adjust what the model got wrong, then export to Primavera P6 or Microsoft Project, or carry the programme into validation. 

GENERATION INTELLIGENCE 

What ConstructMind reads - and builds.

ConstructMind AI builds the schedule foundation from the documents you already hold, connecting scope, quantities, methods and project requirements. Your planners then review, refine and decide what the final programme says.

Drawings 

Structures, zones and levels, read into a work breakdown the programme can be built on. 

Bills of Quantities 

Quantities that inform proposed durations and the resource assumptions behind them. 

Specifications 

Materials, standards and testing requirements that add activities a scope list would miss. 

Method Statements 

The stated construction sequence, read as logic between activities rather than as prose. 

Contract Documents 

Milestones, sectional completion dates and constraints that bound the programme. 

Calendars & Working Patterns 

Shifts, seasons and access windows applied to durations rather than added afterwards. 