You build the schedule. ConstructMind builds the evidence behind it.

General contractors produce more schedules, under more time pressure, with more contractual exposure than any other party on a project. ConstructMind gives your planning team the speed to keep up and the documentation to stay protected.

What project are you planning?

Briefly describe your project to generate a tailored schedule.

Describe your project above

The planning pressures GC teams face and mostly absorb.

General contractors carry the schedule risk. You produce the baseline. You respond to delay events. You defend your programme in disputes. And you do all of it while managing a live project, a live commercial position, and a team that's already stretched.

Tender schedules built under impossible time pressure

Winning work means submitting a credible baseline in days, not weeks. Most GC planning teams are still building from scratch every time, pulling data manually from bid documents with no repeatable process.

Contractual exposure when the schedule is not defensible

Your schedule is evidence in a dispute. If durations are not referenced, logic is not documented, and assumptions are not on record, your commercial position is weak before the conversation starts.

Baseline drift that is hard to explain

The project moves. The schedule moves. But the audit trail between the original baseline and the current programme is often incomplete or absent, making it difficult to explain, justify, or defend what changed and why.

Review capacity that does not scale with submissions

Sub-contractor and sub-programme submissions arrive constantly. Your planners cannot properly review all of them without a tool that does the heavy lifting on detection, comparison, and documentation.

What changes when your planning team uses ConstructMind.

Baselines built from documents not memory

Upload your scope documents, SOV, means and methods, and contract milestones. ConstructMind extracts activities, calculates durations, builds logic relationships, and produces a baseline with every element referenced back to your project documents. From documents to a baseline-ready XER in hours.

Industry standard alignment: duration methodology referenced against AACE International Recommended Practice No. 29R-03.

Schedule updates with a documented audit trail

Every update run through ConstructMind generates a versioned record: what changed, why, and what the impact is on key milestones. When the client asks why a date moved, the answer is already documented.

Delay position built from existing records

ConstructMind uses your project data (the documents, the baseline, the update history) to generate a structured delay analysis starting point. Your planner reviews and refines. ConstructMind does the data assembly.

Supports Time Impact Analysis (TIA) and As-Planned vs As-Built methodologies.

A Basis of Schedule on every file you produce

Every schedule generated or reviewed by ConstructMind includes a full Basis of Schedule document: assumptions, data sources, duration methodology, and logic rationale. Your schedule is defensible from the first question.

Logic density checked against DCMA 14-Point Assessment thresholds before export.

The difference ConstructMind makes for GC planning teams.

Outcome

Baseline production time

Basis of Schedule

Schedule update response

Delay analysis starting point

Quality score before submission

Without ConstructMind

3–5 weeks of data collection and formatting

Written after the fact or not at all

Days of manual analysis per review cycle

Built from scratch days of reconstruction

Unknown until the client reviews it

     With Constructmind

Hours, from existing project documents

Generated automatically with every output

Structured findings ready before the meeting

Assembled from existing project records

Seen and improved before it leaves your team

Outcome Without ConstructMind With Constructmind
Baseline production time 3–5 weeks of data collection and formatting Hours, from existing project documents
Basis of Schedule Written after the fact or not at all Generated automatically with every output
Schedule update response Days of manual analysis per review cycle Structured findings ready before the meeting
Delay analysis starting point Built from scratch days of reconstruction Assembled from existing project records
Quality score before submission Unknown until the client reviews it Seen and improved before it leaves your team

The ConstructMind capabilities GC planning teams use most.

Schedule Generation

Produce a baseline from your project documents. Referenced, documented, and quality-scored before it goes to the client.

See ConstructMind working with your project type.

Book a 30 minute demo tailored to GC planning workflows.

Unlock the potential of Construction AI

Fill out the form below