You build the schedule. ConstructMind builds the evidence behind it.
General contractors produce more schedules, under more time pressure, with more contractual exposure than any other party on a project. ConstructMind gives your planning team the speed to keep up and the documentation to stay protected.
What project are you planning?
Briefly describe your project to generate a tailored schedule.
Describe your project above
The planning pressures GC teams face and mostly absorb.
General contractors carry the schedule risk. You produce the baseline. You respond to delay events. You defend your programme in disputes. And you do all of it while managing a live project, a live commercial position, and a team that's already stretched.
Tender schedules built under impossible time pressure
Winning work means submitting a credible baseline in days, not weeks. Most GC planning teams are still building from scratch every time, pulling data manually from bid documents with no repeatable process.
Contractual exposure when the schedule is not defensible
Your schedule is evidence in a dispute. If durations are not referenced, logic is not documented, and assumptions are not on record, your commercial position is weak before the conversation starts.
Baseline drift that is hard to explain
The project moves. The schedule moves. But the audit trail between the original baseline and the current programme is often incomplete or absent, making it difficult to explain, justify, or defend what changed and why.
Review capacity that does not scale with submissions
Sub-contractor and sub-programme submissions arrive constantly. Your planners cannot properly review all of them without a tool that does the heavy lifting on detection, comparison, and documentation.
What changes when your planning team uses ConstructMind.

Baselines built from documents not memory
Upload your scope documents, SOV, means and methods, and contract milestones. ConstructMind extracts activities, calculates durations, builds logic relationships, and produces a baseline with every element referenced back to your project documents. From documents to a baseline-ready XER in hours.
Industry standard alignment: duration methodology referenced against AACE International Recommended Practice No. 29R-03.
Schedule updates with a documented audit trail
Every update run through ConstructMind generates a versioned record: what changed, why, and what the impact is on key milestones. When the client asks why a date moved, the answer is already documented.

Delay position built from existing records
ConstructMind uses your project data (the documents, the baseline, the update history) to generate a structured delay analysis starting point. Your planner reviews and refines. ConstructMind does the data assembly.
Supports Time Impact Analysis (TIA) and As-Planned vs As-Built methodologies.
A Basis of Schedule on every file you produce
Every schedule generated or reviewed by ConstructMind includes a full Basis of Schedule document: assumptions, data sources, duration methodology, and logic rationale. Your schedule is defensible from the first question.
Logic density checked against DCMA 14-Point Assessment thresholds before export.
The difference ConstructMind makes for GC planning teams.
Outcome
Baseline production time
Basis of Schedule
Schedule update response
Delay analysis starting point
Quality score before submission
Without ConstructMind
3–5 weeks of data collection and formatting
Written after the fact or not at all
Days of manual analysis per review cycle
Built from scratch days of reconstruction
Unknown until the client reviews it
With Constructmind
Hours, from existing project documents
Generated automatically with every output
Structured findings ready before the meeting
Assembled from existing project records
Seen and improved before it leaves your team
| Outcome | Without ConstructMind | With Constructmind |
|---|---|---|
| Baseline production time | 3–5 weeks of data collection and formatting | Hours, from existing project documents |
| Basis of Schedule | Written after the fact or not at all | Generated automatically with every output |
| Schedule update response | Days of manual analysis per review cycle | Structured findings ready before the meeting |
| Delay analysis starting point | Built from scratch days of reconstruction | Assembled from existing project records |
| Quality score before submission | Unknown until the client reviews it | Seen and improved before it leaves your team |
The ConstructMind capabilities GC planning teams use most.

Schedule Generation
Produce a baseline from your project documents. Referenced, documented, and quality-scored before it goes to the client.
See ConstructMind working with your project type.
Book a 30 minute demo tailored to GC planning workflows.